French expertise. Worldwide deployment.Part of GFB International
ENFRES
Discuss your project

PRODUCT RANGE · CBRN DECONTAMINATION

MDT · Multilane Decontamination Tent

Inflatable decontamination tent with three separate lanes, operational in minutes to absorb a mass influx of casualties after a CBRN incident.

See it in CBRN decontamination
MDT three-lane tent with three entrances and its central stretcher conveyor
Bachmann RDS catalogue imagery · CBRN Decontamination

KEY FIGURES

From individual decontamination to mass decontamination.

  • Up to 75 people / hour
  • 3 separate lanes
  • Set up in 10 minutes
MDT · multilane decontamination tent
Up to 75 people per hour · 3 separate lanes, the central one for stretchers · set up in 10 minutes

Inflatable tent with three separate lanes: two walking lanes and a central stretcher lane, for a mass influx of casualties.

TECHNICAL DATA

An immediate response to CBRN crises

When a CBRN incident strikes, the MDT is operational within minutes. Its inflatable frame and plug-and-play system let a small team set it up fast, and it is designed to absorb a massive influx of casualties.

Three separate lanes run through the tent: the two outer lanes for people who can walk, the central lane for casualties on stretchers, moved along a roller conveyor. Men, women and people with reduced mobility are treated at the same time, each in their own lane.

Every essential stage is built in, from reception and undressing to showering, drying and redressing, for a complete and structured decontamination process after an industrial accident, a toxic release or a terrorist attack.

MDT 30MDT 42
Lanes23
Capacity50 people / hour75 people / hour
Surface area30 m²42 m²
Set-up
10 minutes, 3 fitters
Climate resistance
Wind 100 km/h · snow 20 kg/m²
Colours
White, orange, NATO green
Stages
Reception and undressing, showers, drying and redressing

WHERE IT IS USED

CBRN Decontamination

Chemical, biological, radiological and nuclear decontamination systems, from individual cabins to mass decontamination lines.

Explore the solution
  • Civil protection & first responders
  • Military CBRN units
  • Stretcher & non-ambulatory casualties

OTHER RANGES · CBRN DECONTAMINATION

LET’S TALK ABOUT YOUR PROJECT

Talk with our regional contacts.

Share your location, requirements and timing. The right contact for your country replies to start the conversation.

Tell us what you need.

MDT · Multilane Decontamination Tent

Add phone and project details (optional)

Your details are used to review and respond to this enquiry.