French expertise. Worldwide deployment.Part of GFB International
ENFRES
Discuss your project
MDT 42 three-lane decontamination tent with a stretcher conveyor and an individual cabin

MIDDLE EAST & NORTH AFRICA · INVISIBLE THREAT, RAPID RESPONSE

CBRN Decontamination

CBRN decontamination systems for civil defence, emergency services and industrial response teams across the Middle East. Define your personnel flow, decontamination lanes and support equipment with our regional team.

DCLDLMDTMDC
Decontamination systems film · DC, LDL, MDT and MDC · Bachmann RDSWatch full film

YOUR DECONTAMINATION PROJECT

Find the right
configuration.

Share your project location and contact details. Our team will help you define the system and support equipment for your operation.

  • Individual, single-lane and mass decontamination
  • Ambulatory and stretcher patient flows
  • Water, power and wastewater requirements

Let’s define your solution.

A few details to start the conversation. Fields marked * are required.

Add phone and project details (optional)

Your details are used to review and respond to this enquiry.

DESIGNED AROUND YOUR REQUIREMENTS

From individual to mass decontamination.

Plan your response wherever you operate in the Middle East. Define the people to be processed, available water and power, wastewater handling and deployment conditions. Our team will help establish the mobile decontamination configuration and associated support equipment for your operation.

  • Civil protection & first responders
  • Military CBRN units
  • Stretcher & non-ambulatory casualties

PRODUCT RANGES

DC individual decontamination cabin with navy frame, green entry flap and catchment apron

DC · Decontamination Cabin

Details & specifications

Decontamination cabin for individual decontamination.

  • Individual decontamination
  • Up to 30 people / hour
See the product
LDL light decontamination lane with two white textile modules and a central shower cabin

LDL · Light Decontamination Lane

Details & specifications

Light decontamination lane: undressing, decontamination, control and redressing in an ultra-light, ready-to-use system.

  • 10 to 20 min
  • 2 to 4 installers
  • Wind 100 km/h
See the product
MDT three-lane tent with three entrances and its central stretcher conveyor

MDT · Multilane Decontamination Tent

Details & specifications

Inflatable tent with three separate lanes: two walking lanes and a central stretcher lane, for a mass influx of casualties.

  • Up to 75 people / hour
  • 3 separate lanes
  • Set up in 10 minutes
See the product
Deployed MDC system with a red container and connected white and red tents

MDC · Mass Decontamination Container

Details & specifications

Mass decontamination cabin in a 20-foot container with two 30 m² inflatable tents, Wi-Fi remote control tablet, boiler and automatic shower flow management.

  • 120 people / hour
  • 15 min installation
  • ORCHIDS protocol
  • 18 V pump
See the product

TECHNICAL INFORMATION

Define the right
configuration.

Throughput figures are catalogue values and depend on the number of lanes and operating conditions. Final capacity, water and wastewater handling are reviewed with your team.

Request technical documentation
LDL · light decontamination lane
Ultra-lightweight with special foldable shower · 10 to 20 min with 2 to 4 installers
MDT · multilane decontamination tent
Up to 75 people per hour · 3 separate lanes, the central one for stretchers · set up in 10 minutes
MDC · mass decontamination cabin
20-foot container including tanks · installed in 15 minutes · 120 people per hour · ORCHIDS protocol
DC · decontamination cabin
Individual decontamination cabin, compact and rapidly deployable
Common features
18 V low-voltage pump · integrated air drying · CBRN-ready tents compatible with all RDS shelters

Standards & certification
Share your applicable standards and procurement requirements so the team can confirm the relevant documentation for your configuration.

Animated decontamination example supplied by Bachmann RDS.

PREPARE YOUR PROJECT BRIEF

A better brief.
A more useful proposal.

  1. In which country will you deploy, and what is your required timeline?
  2. How many people do you wish to decontaminate per hour?
  3. What lane configuration and stretcher capacity do you need?
  4. Which water, power and wastewater facilities are available on site?

Relevant field references can be discussed with your contact, subject to customer confidentiality and approval.

Ready to plan your response?

Start with your mission. We’ll help define the configuration.

Discuss my project